Seitenansicht 9
10
Double-pole
Isolating Switch
Consumer Unit
Installation
Installation of Mira Orbis
Warning! Turn off the electrical and water supplies before proceeding with the
installation of the Mira Orbis. The electricity must be turned off at the mains and
the appropriate circuit fuse removed, if applicable.
Note! An installation template is supplied to help you install the Mira Orbis.
Remove the three cover retaining
screws.
Carefully remove the cover, making
sure that you do not strain the multi-
connector.
Carefully remove the multi-connector
from the socket on the control PCB in
the case
Remove the service tunnel.
Cover
Cover Retaining
Screw
Service Tunnel
Seitenansicht 9